Metro North Park construction

By | June 14, 2016

Metro North Park layoutMetro North Park 2016 turf field projectUpdated July 13, 2016:  Metro North Park is currently a construction site as field 3 is being converted from grass to artificial turf, and the turf field itself is also being renovated. A large section of the main parking lot is fenced off for equipment, and the main walkway to the clubhouse is closed.

Clubhouse area access

  1. Park near the big signboard near fields 1 and 2.
  2. Walk down the path on the hill between fields 1 and 2.
  3. Follow the path past fields 1 and 2 to the back walkway.
  4. Turn right toward the clubhouse. If you’re looking for the meeting room, walk past the breezeway area and enter the next door on your left.

Or:

  1. Park in the field 1 parking lot. (This parking area isn’t shown in the image, but it’s to the left of field 1.)
  2. Walk around field 1 between the sideline and the fence toward the back walkway.
  3. Walk up the hill toward the clubhouse. If you’re looking for the meeting room, walk past the breezeway area and enter the next door on your left.

Field access

  • Fields 1, 2 and 6:  Follow the directions above.
  • Field 4:  Turn right as you enter the park, pass the turf field, turn left and head up the hill toward the cell phone tower. After parking, walk down the path between the tower and the business park to get to field 4.
  • Field 5:  The field 4 directions probably result in a shorter walk, but the directions to fields 1, 2 and 6 result in an easier walk (flatter surface, more pavement).